Green Bar Footer
 Image Spacer  Image Spacer

Beneficial Uses
 Black Dot Image Introduction
 Black Dot Image Decision Process
 Black Dot Image Sediment Types
 Black Dot Image Glossary
 Black Dot Image Links
 Black Dot Image References
 Black Dot Image K-12 Lessons
 Black Dot Image Lead Organizations
 Black Dot Image Authorities
 Black Dot Image Calendars

Agricultural/Product Uses
 Black Dot Image Aquaculture
 Black Dot Image Construction Materials
 Black Dot Image Decorative Landscaping Products
 Black Dot Image Topsoil

Engineered Uses
 Black Dot Image Beach Nourishment
 Black Dot Image Berm Creation
 Black Dot Image Capping
 Black Dot Image Land Creation
 Black Dot Image Land Improvement
 Black Dot Image Replacement Fill
 Black Dot Image Shore Protection

Environmental Enhancement
 Black Dot Image Fish & Wildlife Habitats
 Black Dot Image Fisheries Improvement
 Black Dot Image Wetland Restoration

View by State

Home
 

 Image Spacer

Mobile, AL (Landfill Cover)

Beneficial Uses: Topsoil, Capping
Lead Agency: City of Mobile, Alabama, Mobile District, Norm Murray & Associates, USACE Waterways Experiment Station
Placement Date(s): 1998
Location: Blakeley Island CDF
Placement Method: Dried dredged material was blended with flyash and proprietary formulations to produce an engineered landfill cover material to meet State regulatory specifications.
Substrate Type: Silt/Clay mixture
Project Size: Laboratory bench-scale tests (5 gallon), Field Demonstration (500,000 cu yd)
Project Costs: $2,400 laboratory, Field Demonstration cost unavailable
Monitoring: On-site testing was performed by the contractor to verify specifications were met.
Comments: Laboratory tests indicated little additives other than moisture were required to meet specifications. Flyash additions exceeded required specifications.